PACIFIC RIM PARKS

Wednesday, May 13, 2009

Day11 - More of the Hard Part!

It's the second day of the construction phase of the park and everyone got a pair of gloves to be able to work safely.

The sunny weather was a sign for them to keep going. The task is to level the land by hand. So it means a lot of lifting, digging and more time under the sun.

The crictical points were measured and properly labeled to serve as reference.

James and Kyle trying to make sure that the leveled area was accurate.

Tired students still having some fun.

More materials came in and they have to lift everything by hand.

Teamwork and cooperation is the key for them to function as one.

Tomorrow will be another digging marathon for them but still with so much enthusiasm on each individual I'm sure the job will be done on time.