PACIFIC RIM PARKS

Monday, July 26, 2010

DAY 14: work and rest

We started our day-of-rest doing a little more work in our basement studio. Our to do list consisted of:




























Working on the site plan to make sure that points of reference are exact. Some measurements had to be checked so that our plans accurately portrary the work that will be on-site.















Experimenting with different flags on a mock-up model of the three flag poles. We needed to figure out what amounts and lengths of fabric would be best to hang from the three 30 foot high cedar poles that will soon be installed. Two long, elegant white banners span between the poles. Three smaller blue flags hang from each pole. The site is usually very, very windy and the flags will almost always be dancing. They will be visible from far away; the land around the site is low and rolling.













We officially began our day-off by walking down the road to lunch.













We spent the rest of the day at the beach.

No comments: